The term Fixed Wiring Inspection &Testing generally refers to the inspection & testing activity of the electrical installation within a building. This being the electrical wiring and systems between the incoming electrical supply and final circuits; eg plug sockets, isolators, lights etc.
The Health and Safety at Work Act 1974 is an act of parliament which places a duty on all employers to; ensure, so far as is reasonably practicable, the health and safety and welfare at work of all their employees.
The maximum period for testing is 1-5 years or when change of occupancy occurs. Below is a table with the types of installations we test as well as the recommended routine check period and maximum period.
Although the level of the periodic Fixed Wired Inspection will be agreed with you, as a minimum, the following tests shall be carried out unless otherwise specified.
CSE is an approved contractor with the National Inspection Council for Electrical Installation Contracting (NAPIT) and accredited by the United Kingdom Accreditation Service (UKAS) to undertake Inspection and Testing of Fixed Wiring Installations.